/
DB
Dennis ByrneLAB DIRECTOR

Lab Overview

Wednesday, June 10, 2026 · Day shift · Burlington, VT

New AccessionAll systems onlineISO 17025 compliant
Today's Samples10
-74%vs. yesterday
Holding Time At Risk5
5 showing below
Pending Review185
Exceedances Open38
Instruments Online11/12
1 in maintenance

Instrument Utilization — Last 24h

Hourly capacity. Maintenance windows highlighted.

1 in maintenance
Instrument000204060810121416182022
GCMS-1 · GC-MS Lab AlphaVOC/SVOC
GCMS-2 · GC-MS Lab BetaVOC/SVOC
LCMS-1 · LC-MS/MS PFASPFAS
ICPMS-1 · ICP-MS iCAP-1Metals
ICPMS-2 · ICP-MS iCAP-2Metals · MAINT
ICPOES-1 · ICP-OES OptimaMetals
IC-1 · IC DionexAnions
GCFID-1 · GC-FID PetroleumTPH
GCECD-1 · GC-ECD PesticidesPesticides
FTIR-1 · FTIR Bruker AlphaTPH
BOD-1 · BOD IncubatorBOD5
MICRO-1 · Micro IncubatorColiform
AI Lab InsightsDaily anomaly + risk briefing
v2 Preview
ICP-MS #1 calibration drift trending upward — last 4 As runs +1.6σ above target. Suggested action: rerun blank + recalibrate.
Holding-time risk elevated for surface-water VOC samples from Lake Champlain Project (4 of 12 below 24h margin).
PFOA exceedance pattern in Burlington DPW wells — 3 sites trending toward EPA MCL. Recommend client alert.
AI Insights — coming in v2
Surface anomalies, holding-time risks, and instrument drift before they cost a re-run. Wire up your Anthropic key to enable.

Recent Activity

Live sampling events from the field

  • 03:32SE-2026-0040 — sampling event at Hatchery Inflow — Raceway 1 for Adirondack Trout Hatchery, 3 containers
  • 01:32SE-2026-0056 — sampling event at Hatchery Inflow — Raceway 1 for Adirondack Trout Hatchery, 3 containers
  • 01:32SE-2026-0338 — sampling event at Cheddar Line — Cutter A swab for Cabot Creamery, 1 container
  • 01:32SE-2026-0156 — sampling event at Main WWTP Outfall 001 for Burlington Department of Public Works, 2 containers
  • 00:32SE-2026-0110 — sampling event at Plant 3 — CIP Rinse Sampling for Cabot Creamery, 1 container
  • 23:32SE-2026-0353 — sampling event at Lebanon Distribution Sample LDS-A for City of Lebanon Water, 3 containers
  • 22:32SE-2026-0129 — sampling event at Manchester Brownfield Boring B-12 for VHB Engineering, 3 containers
  • 20:32SE-2026-0188 — sampling event at Plant 3 — CIP Rinse Sampling for Cabot Creamery, 1 container

Recent Reports

Latest CoAs released

All
  • CoA-2026-00818City of Lebanon Water
    FINAL
  • CoA-2026-00800Burlington Department of Public Works
    FINAL
  • CoA-2026-00825Burlington Department of Public Works
    FINAL
  • CoA-2026-00828Cabot Creamery
    FINAL